Pete Schieck's structured approach to engineering and deploying production controls systems, from discovery through commissioning and long-term support.

1

Discovery & Specification

Site survey, P&ID review, IO lists, functional requirements, URS/FRS documentation

2

Engineering & Design

PLC hardware selection, IO mapping, network architecture diagrams, HMI screen design, panel layout drawings (CAD)

3

Programming

PLC logic (IEC 61131-3: ladder, FBD, ST, SFC), HMI/SCADA development, historian configuration, alarm management setup

4

Integration & Testing

Factory acceptance test (FAT), loop checking, point-to-point verification, simulation testing, cybersecurity hardening

5

Commissioning

Site acceptance test (SAT), system startup, tuning, operator training, 24/7 support during cutover

6

Documentation & Handoff

As-built drawings, O&M manuals, spare parts lists, backup procedures, long-term support plan

Standards & Compliance

IEC 61131-3

PLC Programming Languages

ISA-88

Batch Control

ISA-95

Enterprise-Control Integration

IEC 62443

Industrial Cybersecurity

NFPA 70E

Electrical Safety

FDA 21 CFR Part 11